OEE (Overall Equipment Effectiveness) shows how much of the planned production time was truly productive. It is the product of three ratios: availability, performance and quality. An OEE of 100% means only good parts, made at the ideal speed, with no stops.

The OEE formula

OEE = Availability × Performance × Quality
RatioFormulaWhat it captures
Availabilityrun time ÷ planned production timelosses from stops: breakdowns, changeovers, missing material
Performance(parts × ideal cycle time) ÷ run timespeed losses: slow running, small stops
Qualitygood parts ÷ total partslosses from scrap and rework

Planned production time is the shift length minus planned breaks. Run time is planned time minus downtime. The ideal cycle time is the fastest possible time to make one part on that machine – not the planned rate.

Step-by-step example

An example shift (illustrative numbers, not data from a specific plant):

Shift length8 h = 480 min
Planned breaks30 min → planned time 450 min
Downtime (breakdown, changeover)45 min → run time 405 min
Ideal cycle time30 s (0.5 min per part)
Parts produced720, of which 700 good
  1. Availability = 405 ÷ 450 = 90.0%
  2. Performance = (720 × 0.5) ÷ 405 = 360 ÷ 405 = 88.9%
  3. Quality = 700 ÷ 720 = 97.2%
  4. OEE = 0.900 × 0.889 × 0.972 = 77.8%

Quick check: OEE also equals good parts × ideal cycle time ÷ planned time = 700 × 0.5 ÷ 450 = 77.8%. Both ways must give the same result – if they don't, the data has an error.

What is a good OEE?

A commonly cited "world-class" level is 85%. In practice, comparing with your own baseline matters more than comparing with someone else's number: OEE measured the same way every shift shows whether your actions improve production. Results depend on the industry, the type of machine and how planned time is defined – so when comparing lines, make sure they all calculate OEE by the same rules.

Common mistakes when calculating OEE

Measuring OEE automatically

  1. Every part as an event. A sensor or PLC records each part with an exact timestamp and, where possible, a good/bad result.
  2. Shift and break calendar in the system, so planned time is calculated for every shift.
  3. Automatic downtime detection. No part for longer than a set threshold opens a stop; the operator gives the reason.
  4. Ideal cycle time per product, so performance follows the right rate after a changeover.

That is how BEAT works: it calculates OEE live for every line and shift, splits it into availability, performance and quality, and shows which stops cost the most.

Questions about OEE

What is the difference between OEE and TEEP?

OEE relates losses to planned production time. TEEP relates them to all calendar time (24/7), so it also shows unused shifts and weekends.

Can OEE be above 100%?

Not with correct data. A result above 100% almost always means the ideal cycle time is set too long, for example from the planned rate.

How often should OEE be calculated?

Continuously, summarised per shift. Daily or weekly OEE from manual reports shows a problem only when it is too late to react.

Where should OEE improvement start?

With the biggest loss. Usually one or two downtime reasons dominate – a Pareto of downtime reasons shows where improvement gains the most time.